project brief


HCA Hospital
Running new primary conduit from the street vault to the main electrical room, then stubbing up, backfilling in controlled lifts and compacting to spec, all while the hospital stayed fully operational.
the result
Conduit installed in three night shifts, inspections passed first time, and power remained uninterrupted throughout. Final density tests averaged 97 %, giving the owner a rock-solid duct bank for future growth.