project brief


HCA Hospital
Preparing the electrical room by installing conduit stub-ups through the slab, then backfilling in 8-inch lifts with density testing to create a stable base for new switchgear.
the result
Twenty-four stub-ups installed, laser-verified true; four lifts compacted to a 97 % average; room handed back dust-free six hours before morning rounds, keeping the switchgear schedule ahead of plan.
recent projects
Delivering dependable underground utility solutions you can trust.




